Anstellco (Beijing) Technology Co., Ltd.

Cn | En

  • HOME

  • ABOUT US

  • PRODUCTS

  • SOLUTIONS

  • REFERENCES

  • SUPPORT

  • SERVICE

  • NEWS

  • CONTACT US

Astellech (Beijing) Technology Co., Ltd.

Solution

Solution

Picture Name

Prison

School

Rail Transit

automobile industry

Medical system

Residential property

military industry

Expressway

Airport industry

Energy Industry

Tourist Attractions

Sports venues

Government Organs

Financial Institutions

Commercial Building

Solution


Rail Transit

Rail Transit

The passenger flow of rail transit is very large. According to different transportation environments, we recommend using different fast lanes or other doors to achieve energy saving, safety and order. Therefore, we recommend the following solutions: the waiting hall of the train station is the only way to get on the train and is also the place for all passengers to rest. In order to ensure that the energy in the waiting hall of the train station is not lost or less lost, we recommend RECORD series and BLASI series. Two-way electronic control passage, single/two-way card swiping in and out, both one-way control and two-way control of personnel in and out. The gate has multiple status modes when it is in standby: normally open/normally closed/free

View Details
< 1 >

HOME     ABOUT US     PRODUCTS     SOLUTIONS     REFERENCES     SUPPORT     SERVICE     NEWS     CONTACT US

ANSHI Technology(Beijing)CO.Ltd.    Copyright © 1999-2017 300.cn All Rights Reserved

Powered by www.300.cn

TEL: 010-8273 7280

Follow us: Sina Weibo

seo